Detroit Electric V.5/05 Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Chauffages d'appoint Detroit Electric V.5/05. Detroit Electric V.5/05 User's Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 12
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
Warranty registration options:
1. Register online at www.reverberray.com/warranty
2. Complete the information above and fax to Detroit Radiant Products Co.
3. Complete the information above and mail to Detroit Radiant Products Co.
Printed in U.S.A.
© 2005 Detroit Radiant Products Co.
21400 Hoover Rd., Warren, MI 48089
T. (586) 756-0950 F. (586) 756-2626
Form# LIOAG2-2M-9/05 (ID)
Replaces Form# LIOAG2-1M-03/01
AG2 Series
ENGLISH
Project: _______________________________ Date: ____________________
Customer Name: __________________________________________________
Location: ________________________________________________________
City: ___________________________ State: __________ Zip: _____________
Contractor: _______________________________________________________
Engineer: ________________________________________________________
Address: ________________________________________________________
City: ____________________________ State: _________ Zip: _____________
Serial #: _______________________________ Phone#: __________________
Local Representative: _______________________________________________
Date of Installation: ________________________________________________
Notes: __________________________________________________________
** Model requires 5EA-SUB accessory package.
AGAO-SS - Upgrade burner box from coated steel to 304 Series Stainless.
ALUM-AO - Upgrade hot rolled steel radiant tubes to black coated 16ga. aluminized steel for maximum efficiency and longevity.
Highly recommended in any contaminated or moisture laden environment (ex. poultry applications). See chart above for quantity needed.
*For complete installation instructions, see the General Manual that accompanied this piece.
Additional literature on this and other products are available at www.detroitradiant.com.
AG2 Series V.5/05 - 4” Tube Heater Installation, Operation, Maintenance and Parts Manual*
WARNING: This heater must be installed and serviced by trained gas installation and service personnel only!
Improper installation, adjustment, alteration, service or maintenance can cause property damage, injury or death.
Read the installation, operating and maintenance instructions thoroughly before installing or servicing this equipment.
Protect yourself and others by observing all safety information. Retain instructions for future reference.
!
Model V.5/05
Swine Arena Dairy Poultry
Polebarns
&
Shops
AG2-20-65 N or LP 65,000 50,000 No Yes No Yes Yes 21'-7" 13'-0" 120# - 2 6' - 9' Aluminized 4" Hot Rolled Qty. 1
5
AG2-20-75 N or LP 75,000 50,000 No Yes Yes Yes Yes 21'-7" 13'-0" 120# - 2 7' - 10' Aluminized 4" Hot Rolled Qty. 1 5
AG2-30-65 N or LP 65,000 50,000 No Yes No Yes Yes 31'-3" **17'-8" 160# - 2 6' - 9' Aluminized 4" Hot Rolled Qty. 2 5
AG2-30-75 N or LP 75,000 50,000 No Yes Yes Yes Yes 31'-3" **17'-8" 160# - 2 7' - 10' Aluminized 4" Hot Rolled Qty. 2 5
AG2-30-100 N or LP 100,000 65,000 No Yes Yes Yes Yes 31'-3" **17'-8" 160# - 2 8' - 14' Aluminized 4" Hot Rolled Qty. 2 6
AG2-40-65 N or LP 65,000 50,000 No Yes No Yes Yes 40'-11" 22'-8" 190# - 2 6' - 9' Aluminized 4" Hot Rolled Qty. 3 5
AG2-40-75 N or LP 75,000 50,000 No Yes Yes Yes Yes 40'-11" 22'-8" 190# - 2 7' - 10' Aluminized 4" Hot Rolled Qty. 3 5
AG2-40-100 N or LP 100,000 65,000 No Yes Yes Yes Yes 40'-11" 22'-8" 190# - 2 7' - 11' Aluminized 4" Hot Rolled Qty. 3 5
AG2-40-125 N or LP 125,000 95,000 No Yes Yes Yes Yes 40'-11" 22'-8" 190# - 2 9' - 14' Aluminized 4" Hot Rolled Qty. 3 5
AG2-40-150 N or LP 150,000 100,000 No Yes Yes No Yes 40'-11" 22'-8" 190# - 2 10' - 14' Titanium 4" Hot Rolled Qty. 3 5
AG2-50-100 N or LP 100,000 65,000 No Yes No Yes Yes 50'-7" **27'-4" 235# - 2 8' - 11' Aluminized 4" Hot Rolled Qty. 4 5
AG2-50-125 N or LP 125,000 95,000 No Yes Yes Yes Yes 50'-7" **27'-4" 235# - 2 9' - 14' Aluminized 4" Hot Rolled Qty. 4 5
AG2-50-150 N or LP 150,000 100,000 No Yes Yes No Yes 50'-7" **27'-4" 235# - 2 10' - 14' Titanium 4" Hot Rolled Qty. 4 5
AG2-60-150 N or LP 150,000 100,000 No Yes Yes No Yes 60'-3" 32'-4" 270# - 3 10' - 14' Titanium 4" Hot Rolled Qty. 5 5
BTU/H
Low Fire
Uncoated
Combustion
Chamber
Radiant
Emitter Tube
Alum.
Add On
Baffle
Pieces
Applications
Straight
Length
Weight -
Pcs.
Suggested
Mounting
Height
U-Tube
LengthQty. Model #
Gas Type
(circle one)
BTU/H
High Fire
VTable of Contents
Page
Models 1
Warnings 2
Clearances to Combustibles 2
Product Summary 3
Product Instructions 3
Heater Requirements 4
Theory of Operation 4
Wiring Diagrams 5-7
Flowchart 8-9
Parts Listing 10-11
Series Kit Contents 12
Vue de la page 0
1 2 3 4 5 6 ... 11 12

Résumé du contenu

Page 1 - AG2 Series

Warranty registration options:1. Register online at www.reverberray.com/warranty2. Complete the information above and fax to Detroit Radiant Products

Page 2

AG2 Series - 4” Tube Heater Installation, Operation, Maintenance and Parts ManualAG2 Series10Parts Breakdown

Page 3 - = Baffle location

11AG2 Series - 4” Tube Heater Installation, Operation, Maintenance and Parts ManualAG2 Series Basic Parts ListAG2 SERIES PARTS LISTING** 6' TOTA

Page 4

Kit Contents & Product FeaturesAG2 Series - 4” Tube Heater Installation, Operation, Maintenance and Parts Manual12PRODUCT FEATURES Kit contents fo

Page 5 - AG2 Series Wiring Diagrams

AG2 Series - 4” Tube Heater Installation, Operation, Maintenance and Parts ManualAG2 Series2FRONT BELOWAG2 (20,30,40) - 65 [N,P] 0º 9 9 6 6045º 39 8 1

Page 6

3AG2 Series - 4” Tube Heater Installation, Operation, Maintenance and Parts ManualAG2 Series Mechanical InstructionsThis supplement is designed to add

Page 7 - SIDE WALL INSTALLATION

4AG2 Series - 4” Tube Heater Installation, Operation, Maintenance and Parts ManualAG2 SeriesElectrical Requirements•120 Volt - 60 Hz GRD, 3-wire.• 24V

Page 8

5AG2 Series - 4” Tube Heater Installation, Operation, Maintenance and Parts ManualAG2 Series Wiring Diagrams

Page 9

6AG2 Series - 4” Tube Heater Installation, Operation, Maintenance and Parts ManualAG2 SeriesField Wiring DiagramsELECTRICIAN: 24V must be field suppl

Page 10

7AG2 Series Sample Brooder Installation DiagramsAG2 Series - 4” Tube Heater Installation, Operation, Maintenance and Parts ManualCENTER HOUSE INSTALLA

Page 11 - AG2 Series Basic Parts List

AG2 Troubleshooting Flow Chart8Is the power at the heater120V?Check power across thegreen and white wires of theyellow control cord. Is thepower 24V?

Page 12 - PRODUCT FEATURES

9After ignitor iswarmed up, does gas valveopen?YESNOTest for 24V at valveduring valve openingperiod (usually 30-45seconds after power to theheater).

Commentaires sur ces manuels

Pas de commentaire